全部都是由他與他的員工手工生產,每部要花3個整天來組裝與測試,每部都有序號與文件管理,沒有一個部份是委外處理,數位的PCB版也是手工焊接。
Production:
Everything is made by hand by myself or my employee - the Master of Perfectionism in soldering. The process takes 3 full days of preparations, assembly, testing, burn-in and listening in my Nirvana system. Every unit is numbered and documented. Nothing is outsourced . The digital PCB is soldered by hand every time,.

所有的元件都由他自己決定,都是超過規格的,大部份是軍用的,偏號蘇聯或華沙的產品
Parts:
I use parts of MY CHOICE. And I make absolutely no apologies for that. I won’t accept any pressure to change the parts to any other than my own. All parts are over-specified, usually old stock, mostly military, preferably Soviet made or Warsaw Pact. (Disarmament is a part of my mission). Reme